The project included repairing uneven, crater-like drain surrounds that had been interfering with drainage. Preparation photos document machine grinding, edge grinding and connected dust extraction.
Project photos
Machine grinding with connected dust extraction across the 1,345 sq ft area.Uneven, crater-like drain surrounds repaired before coating.Polyurea base coat applied before the full-broadcast Domino flake.Project photo 4 — coming soon.Project photo 5 — coming soon.