Completed in January 2026, this 1,800-square-foot metallic epoxy project brought a custom finish to a Coudersport property.
Our process included concrete profiling, crack repairs, an MVB grout coat, and a separate moisture vapor barrier layer before installing the metallic design and high-wear urethane topcoat.
Copper, cream, and gray tones flow around the room’s stone fireplace and wood interior, creating a floor with its own character.